Client: Fagioli
Project: Bechtel / Curtis LNG project

The purpose of the job was to assist as ballast engineer during the load-out of the “Propane Pipe Rack” onboard a barge, carried out at Laem Chabang – Thailand by means of self propelled modular transporters.